Steel Sleeve For Aluminum Strips Rolling Mill Winder
Delivery term:The date of payment from buyers deliver within days- Price:
Negotiable
- minimum:
- Total supply:
- Delivery term:
The date of payment from buyers deliver within days
- seat:
Shandong
- Validity to:
Long-term effective
- Last update:
2017-08-10 00:14
- Browse the number:
80
- Yantai Ted Machine Co.,Ltd By certification [File Integrity]
-
Contact:
taide(Mr.)
- Email:
- Telephone:
- Phone:
-
Area:
Shandong
-
Address:
No.27-6-10 Zhichu Rood, Yantai City, Shandong Province, China
- Website: http://www.tedmetal.com/ http://taide.88888sy.com/
Product details
1. Scope of Usage and Classification
1-1.Scope of Usage
The steel sleeve will be used for the left & right winder of aluminum strip rolling mill
1-2. Size :as drawing
1-3 .Usage Conditions
As the customer requirement
2. Benchmark Related to Pilot Project
2-1. Hardness Inspection
Three point inspection: By using "Hardness Meter" device conduct inspection on either and middle of the sleeve, and collect data for three times from each test point and compare them with the theoretical value, then determine if it is qualified or not.
2-2. Size Inspection
By using steel tape measure, check the Out Diameter and Length, collect data and take the average to compare with the therotical value.
Inner Diameter will be checked by using inside micrometer, and data will be collected for three times from each test point and compare them with the therotical value, the reading accuracy will be one tenth.
3. Necessary Conditions And Quality Assurance
Material:Alloy forged steel
Roughness:as requirement
Mechanical properties :as requirement
When the Left / Right Winder create tension, the steel sleeve must be no deformation, rupture, or less inner / outer strength and abrasion that lead to slippage.
we will submit the Manufacturing Drawings before starting the manufacturing process, after the client verify it, manufacturing process can have a start. ( 3 Copies: 1 copy for returning, two copies for keeping)
4. Packaging and Transportation
4-1. Packaging:Each steel sleeve shall be packed in a wooden box, surface will be coated with grease oil, and covered with plastic materials fully in order to protect from rusting and surface corrosion.
4-2. Transportation: protected from any damages and deformations.
5. Quality Ensurance
we guarantee that performance of the steel sleeve meets the requirements and the related standards, and should satisfy the buyer with the usage for 12 months from date of acceptance.
6.Delivery time
as the quantity
7.payment
as agreement
if you need forged steel sleeve ,welcome to contact with us through email tedmachine@live.com
-
500GPD Direct Flow RO Water Filter
price: Negotiable
-
WDW Computer Control Universal Testing Machine
price: Negotiable
-
600GPD Direct Flow RO Water FIlter
price: Negotiable
-
Euro Garden Fence
price: Negotiable
-
Toroid Core Inductor
price: Negotiable
-
Remotely Control Motorized T Port 3 Way Valve
price: Negotiable